Conference Papers Database New search

Well Intervention and Enhancement in Dieng Geothermal Field, Indonesia

I.A. Elfajrie, S.K. Adityawan, L.H. Judawisastra, M.I. Nurpratama, D. Herman and R.C.M. Malate

Key words
Dieng, well enhancement, acid stimulation
Conference
New Zealand Geothermal Workshop
Year
2020
Session
Session 7.2
Language
English
Paper number
84

Full text

1000KB, opens in a new tab

Abstract

PT Geo Dipa Energi, (Persero) started developing Dieng Geothermal Field in 2002 and has since implemented operational strategies to sustain steam supply to the installed plant capacity of 60 MWe. Periodically, the company conducted a candidate selection and prioritization of the wells for well workover and enhancement to address steam supply and injection capacity shortfall. The results of evaluation formed the basis in implementing a well intervention and acid stimulation campaign for the prioritized candidate production and injection wells in Dieng Geothermal Field. Improvements were initiated in terms of well testing and analyses and acid treatment design to increase the effectiveness of the well stimulation. The use of electronic pressure-temperature-spinner logs and improved well test interpretation became essential for better candidate selection, acid treatment design, quantification of pre-acidizing well parameters and evaluation of acidizing results. To date, acid stimulation program has been successfully implemented in three production wells and two injection wells. Considerable improvement in production and injection capacities of these wells were attained that improved the operational level of the power plant in Dieng Geothermal Field.

Copyright 2020, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.80 (216.73.217.80).
Viewed 22 September 2026, 7:50 am.