Pertamina Geothermal Energy (PGE) as a subsidiary of Pertamina (Persero), which is engaged in the geothermal business, is authorized by the Indonesian government for several working areas. Some of these work areas are managed by PGE directly and the others are managed by contractors in form of a Joint Operation Contract (JOC). Until now there are 5 (five) JOC that are still running, namely JOC Salak (West Java), JOC Darajat (West Java), JOC Wayang Windu (West Java), JOC Sarulla (North Sumatera), and JOC Bedugul (Bali).
From 2017 until mid-2019, there were several important changes in the management of JOC, including: the changes of JOC Salak and JOC Darajat management contractors in 2017, and Commercial Operation Date (COD) of 3 power plant units @110 MW by Sarulla JOC contractor which increased installed capacity of geothermal power plants in Indonesia to 1,948.5 MW in 2017-2018.

Copyright 2019, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.