TE MIHI GEOTHERMAL POWER STATION – HOTWELL PUMPS – A TALE OF UNINTENDED CONSEQUENCES

D. Morrison

Key words
Hot Well Pump, Vibration, Cavitation
Conference
New Zealand Geothermal Workshop
Year
2017
Session
Session 5.1: Production
Language
English
Paper number
90

Full text

698KB, opens in a new tab

Abstract

The Te Mihi geothermal power station hotwell pumps (HWP) are a special duty “closed can” design of pump used to extract condensate under vacuum from a direct contact condenser and return it to the cooling tower (CT).
During procurement the Engineer Procure Construct (EPC) contractor pursued a variation with the pump Original Equipment Manufacturer (OEM) for the closed can material selection. With the change in material, the can shape was modified from a typical Hydraulic Institute type of design and this affected the hydraulic performance of the can.
This case study reviews a number of lessons learned for design impacts from an apparently small change.