Forked Wellbore Completions Improve Development Strategy
- Conference
- New Zealand Geothermal Workshop
- Year
- 1988
- Session
- Borehole, Feedzones
- Language
- English
Full text
251KB, opens in a new tab
Abstract
In recent years nearly half of the development wells drilled in the Southeast Geysers were, at best, capable of only marginal steam producing from their original production interval. Traditionally, this original hole "leg" was plugged and abandoned and the well directionally redrilled, usually from the casing shoe, to an alternate bottom-hole target. Often two or even three such redrills were required before an economically acceptable producer was realized. Northern California Power Agency (NCPA) has recently developed an innovative drilling technique whereby a subcommercial original hole producing interval is retained and its production is then combined with that obtained from the redrilled leg, resulting in a "forked" completion. Five such two-legged well completions have been attempted in the past year, all of which were successful. This technique has permitted the profitable exploitation of heretofore economically unattractive or marginal areas of the reservoir.
Copyright 1988, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.