Impact of Drilling Equipment Quality Condition and Expertise Availability on Well Drilling Cost- a Case Study of Olkaria Geothermal Field.

Paul Kevin Omondi Otieno

Key words
Downtime, drilling equipment, drilling time analysis
Conference
ARGeo
Year
2016
Language
English

Full text

354 KB, opens in a new tab

Abstract

Geothermal drilling is an expensive activity whose cost have a direct bearing on the final cost of a geothermal project. It is desirable to have no downtime during drilling. Such a well would take less time to drill and even hasten delivery of a geothermal project. It is therefore important to optimize the drilling time so as to reduce the cost of drilling the well. To achieve this, an analysis of the cause of non-productive time caused by equipment downtime (which forms the bulk of NPT recorded in Olkaria) incurred while drilling a well is necessary so as to identify areas of improvement. This paper highlights the causes of non-productive time occasioned by equipment downtime through drilling time analysis of nine wells drilled in the Olkaria field in Kenya with the view of improving on the causing factors and hence saving on costs.

Copyright 2016, ARGeo. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.142 (216.73.217.142).
Viewed 21 September 2026, 2:48 pm.