Analysis of Non-Productive Time in Geothermal Drilling Operations - a Case Study of Olkaria.
- Conference
- ARGeo
- Year
- 2016
- Language
- English
Full text
261 KB, opens in a new tab
Abstract
Geothermal well drilling is one of the most expensive activities in a geothermal project. Daily operational costs, such as the daily rig rate, make up a big part of drilling costs. The longer it takes to drill a well, the more expensive the well becomes. It is therefore important to optimize the time spent in drilling so as to optimize the cost of a well. To achieve this, an analysis of the non-productive time incurred while drilling a well is necessary so as to identify areas of improvement. This paper gives a review of the non-productive time incurred while drilling geothermal wells in the Olkaria field in Kenya with the view of improving the process and hence saving on costs.
Copyright 2016, ARGeo. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.