The Velika Ciglena Geothermal Project - 15 MW Single Turbine Binary Plant

Guercio, M; Bonafin, J

Key words
ORC, binary, medium enthalpy, geothermal, largest ORC turbine, axial turbine, turbine efficiency, Croatia, Velika Ciglena, EPC, turn-key solution, fluid selection, cycle optimization, customization
Conference
European Geothermal Congress
Year
2016
Session
Technology and Best practice – Power
Language
English
Paper number
T-PO-185

Full text

734KB, opens in a new tab

Abstract

The paper describes the Binary power plant that will be installed at the Velika Ciglena geothermal field, in Croatia. Turboden awarded the full Engineering Procurement and Construction scope well-to-well, including the engineering of the geothermal gathering and reinjection system. The design conditions allow for a 15 MWe design capacity. Turboden will install a single turbine that therefore will be the largest ORC turbine ever. An additional 1,5 MWe will be produced considering the expansion of the Non Condensable Gases. The Velika Ciglena field is a liquid dominated geothermal field known since the eighties. It is foreseen that after the first powerplant, further potential expansion of the geothermal capacity installed will be possible in the area.

Copyright 2016, EGEC / EGC2016. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.