Conference Papers Database New search

Assessing geothermal risk prior to drilling

Daniilidis, A; Doddema, L; Herber, R

Key words
direct use, 3D numerical model, uncertainty, risk assessment, Rotliegend
Conference
European Geothermal Congress
Year
2016
Session
Technology and Best practice – Exploration and Planning
Language
English
Paper number
T-EP-40

Full text

1781KB, opens in a new tab

Abstract

The planning phase of geothermal projects involves diverse levels of uncertainty. Consequently, risk remains high prior to exploration drilling. Generating a qualitative risk matrix, supported by numerical results can aid the decision-making process during the planning phase of a geothermal installation.
A discrete parameter analysis can be employed to rank the relative influence of these uncertainties. In this setting, uncertainty is classified in three main categories, namely: initial subsurface conditions (pressure, gas saturation), geological and geophysical properties (permeability and fault seal) and lastly operational parameters (flow rate and re-injection temperature). By populating the uncertainty classes with discrete values and simulating all combinations, a qualitative and quantitative risk assessment can be performed.
Using the case study of the envisioned Groningen geothermal doublet, we present a workflow that integrates seismic, petrophysical and reservoir data. The generated risk matrix identifies pressure depletion as a major project risk. Furthermore, power generation can be maintained beyond 60 years, while similar power output can be achieved with different combinations of flow rate and re-injection temperature.

Copyright 2016, EGEC / EGC2016. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.146 (216.73.216.146).
Viewed 22 September 2026, 3:32 pm.