Towards a comprehensive environmental monitoring of a geothermal power plant in the Rhine graben
- Key words
- Upper Rhine graben, Environment, monitoring, seismicity, geodesy, groundwater, corrosion, noise emission, natural radioactivity, CAPEX, OPEX
- Conference
- European Geothermal Congress
- Year
- 2016
- Session
- Technology and Best practice – Environmental Impact
- Language
- English
- Paper number
- T-EI-282
Full text
623KB, opens in a new tab
Abstract
The purpose of this paper is to present the main environmental monitoring performed during operational phases of a geothermal power plant in the Upper Rhine graben and their associated cost. Five kinds of impacts are identified and monitored from large to local scale influence: induced seismicity and surface deformation, surface water and shallow groundwater resources protection, neighbourhood disturbance, such as vibrations or noise emissions, and evolution of the natural radioactivity resulting from the scaling. To ensure the acceptability of geothermal projects in the Rhine graben, it is strongly required to measure and to apply procedures to minimize those different physico-chemical impacts on the environment and neighbourhood.
Copyright 2016, EGEC / EGC2016. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.