Conference Papers Database New search

ADAPTING SURFACE FACILITIES TO CHANGES IN ROTOKAWA RESERVOIR IN THE FIRST 5 YEARS OF NGA AWA PURUA

V. Hoepfinger, A. Marsh and R. Maginness

Key words
Geothermal, Steam Field, Surface Facilities, Power Plant, Well Evaluation, Pipeline Model, Rotokawa, Nga Awa Purua
Conference
New Zealand Geothermal Workshop
Year
2015
Session
Session 8B
Language
English
Paper number
58

Full text

298.24 KB, opens in a new tab

Abstract

The Rotokawa geothermal field has performed well during the five years since the commissioning of Nga Awa Purua Power Station, which brought about a five-fold increase in electrical output from the field. A process of careful monitoring supported by predictive modelling and evaluation of enhancement opportunities has been required to ensure this success. Pressure drawdown and chemistry trends in the reservoir have meant that changes to the production/injection strategy have been directed at improving the response of the field. The production to both power plants has experienced declining enthalpy pointing to a need for adaptive changes to maintain efficient operation over the plant lifetime. Nga Awa Purua has a centralised triple-flash steam separation arrangement and as a result its maximum output is sensitive to off-design fluid delivery conditions. The longer-standing second power plant, Rotokawa, also has a high-pressure fuelling requirement using an interconnected gathering system with aging wells. This paper summarises the experience and the optimisation, control and flexibility measures incorporated into plant and steam field operation.

Copyright 2015, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.195 (216.73.216.195).
Viewed 23 September 2026, 6:27 pm.