Conference Papers Database New search

Well ZD-1 the First Production Well in Granodiorite Basement at the Zunil Field, Guatemala

Garcia, O.L. and L. A. Estrada

Location
Zunil, Guatemala
Conference
New Zealand Geothermal Workshop
Year
1991
Language
English

Full text

315KB, opens in a new tab

Abstract

Well ZD-1 the first of a series of three development wells planned for the Zunil I field,was drilled and completed to a depth of 1516 m. well successfully met its objective encountering a zone of high temperature and high permeability near m-1,475 m depth, within crystalline basement rocks.ZD-1was drilled toa depth of 730 m, then it was directionally drilled towards its target, south of the wellhead location. The well reached a maximum drift angleof 13 to 15 with a true vertical depth of 1,497 m,and the location is 158m south and 23 m east of the wellhead. high permeability was found in the granodiorite, beginning at m.This is expected to be the production zone for ZD-1. The injectivity index is cu .From the vertical discharge, an initial productivity of about 14 was estimated.

Copyright 1991, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.5 (216.73.217.5).
Viewed 22 September 2026, 12:09 am.