Abstract

The Ogiri geothermal power plant started its operation in March 1996 with installed capacity of 30MW. Since the beginning of operation, the plant has successfully maintained high utilization factor of over 90% in average. Timely change of well operations and developing a new area within Ogiri contributed to the long term high level productivity of the plant.

Copyright 2014, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 2 October 2026, 1:57 am.