Understanding Permitting Impacts on the Levelized Cost of Energy for Geothermal

Wiedmeyer, Jared; Schwabe, Paul; Williams, Tom

Key words
Permitting; levelized cost of energy; regulations; cost modeling; geothermal regulatory roadmap
Location
United States
Conference
Geothermal Resources Council Transactions
Year
2013
Session
Energy policy; Laws and regulations; Permitting; Economics
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

In 2011, a panel of geothermal experts assembled by the U.S. Department of Energy concluded that, aside from resource discovery risk, permitting and financing costs are two other critical barriers to future geothermal development. In response to this assessment, the following analysis aims to illustrate how permitting delays and associated cost overruns can significantly impact the cost of geothermal project development. By conducting a simple financial analysis using a publicly available model, it demonstrates that these delays and cost overruns could increase a project?s levelized cost of energy (LCOE) by up to 13.3% over a base-case scenario. This represents a significant increase, and could jeopardize the financial attractiveness of a given project. Finding ways to improve the efficiency of the geothermal permitting process? without sacrificing environmental protection?can reduce such unforeseen delays and LCOE increases, potentially improving the technology?s competitiveness and expanding its use in the marketplace.

Copyright 2013, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.217.92 (216.73.217.92).
Viewed 24 September 2026, 1:24 pm.