Conference Papers Database New search

Development and Production Performance of the Tiwi Field

B.J. Barker, P.G. Atkinson, and T.S. Powell

Location
Tiwi, Philippines; Luzon
Conference
Stanford Geothermal Workshop
Year
1990
Language
English

Full text

717KB, opens in a new tab

Abstract

The Tiwi geothermal field on Luzon Island, Philippines, was developed during 1972-1982 bv Philimine Geothermal Inc. (PGI), the local subisidiary of Unocal Corporation, and the National Power Corporation. Exploratory drilling in 1972-1974 proved reserves for the initial 110 MW plant. PGI's continued drilling success combined with a national electric power shortage to accelerate field development. By the beginning of commercial production in 1979, six turbine generator sets were either installed or on order. In 1982, steam production exceeded eight million lb/hr (3600 Tonnes/ with the startup of Units 5 and 6.

Copyright 1990, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.217.5 (216.73.217.5).
Viewed 22 September 2026, 12:10 am.