An Update on The Basic Design of Lumut Balai Geothermal Power Plant, Indonesia
- Key words
- Geothermal power plant, basic design, Clean Development Mechanism
- Conference
- World Geothermal Congress
- Year
- 2015
- Session
- Power Generation
- Language
- English
- Paper number
- 26060
Full text
455 KB, opens in a new tab
Abstract
Lumut Balai Geothermal Power Plant Project is a part of Power Plant Accelerated Development using Renewable Energy as per Ministry of Energy and Mineral Resources (MEMR) Regulation No. 01 of 2012. This policy was taken by Government of Indonesia to increase the energy utilization based on new and renewable energy. Due to the increasing of the electricity demand, Lumut Balai Geothermal Power Plant is expected to strengthen energy supply in Sumatra Island electricity grid system. This technical paper will update the basic design of the geothermal power plant according to previous research published under United Nations University Geothermal Training Programme (UNU GTP) in 2010. The update is indispensable since the project has been progressing. The update is including re-calculation on the heat and mass balance and determination of the main equipments technical specification. The UNFCCC Clean Development Mechanism Project Design Document is also taken into consideration during engineering design phase especially for the monitoring and equipment installation aspect.
Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.