Technical and Economical Analysis of 5 and 30 MWe for Meshkin-Shahr Geothermal Power Plant
- Key words
- technical, economical, Meshkin-Shahr, power plant, Iran
- Conference
- World Geothermal Congress
- Year
- 2015
- Session
- Power Generation
- Language
- English
- Paper number
- 26005
Full text
827 KB, opens in a new tab
Abstract
11 wells have been drilled in Meshkin-Shahr near Sabalan montain in north-west of Iran. The 7 wells are production, 2 wells are reinjection and 2 wells are out of reservoir. . According to the well test the mass flow of the wells are 30-70 kg/s and the temperature are 130-170`C. In this report, technical and economical possibility of geothermal power plants for 5 or 30 MWe will be calculated.