Conference Papers Database New search

Geothermal Drilling Time Analysis-A Case Study of Menengai and Hengill

Lilian OKWIRI

Key words
drilling challenges, drilling time, non-productive time
Conference
World Geothermal Congress
Year
2015
Session
Drilling and Completion Technology
Language
English
Paper number
21007

Full text

601 KB, opens in a new tab

Abstract

Drilling operations are run on tight schedules and drilling time delays come at a high cost. A large part of drilling workdays is spent on making the wellbore and activities that support drilling, contributing to productive time (PT) while a significant part of the time is spent on drilling problems and activities aimed at finding solutions and solving these problems. This contributes to non-productive time (NPT). Problems occurring in drilling can be avoided sometimes but in other occasions they are beyond the drilling crew control, their causes are numerous and their effects undesirable. This paper analyses drilling time for 15 wells drilled in Menengai, as well as identifying the cause of NPT and attempting to find solutions aimed at increasing PT while reducing NPT to make the drilling process effective. Data from Hengill wells in Iceland was used for comparison.

Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 28 September 2026, 10:56 pm.