Production-Injection at the Costa Rica Geothermal Fields: Miravalles and Pailas
- Key words
- Miravalles, production, injection, Pailas
- Conference
- World Geothermal Congress
- Year
- 2015
- Session
- Case Histories
- Language
- English
- Paper number
- 06045
Full text
2524 KB, opens in a new tab
Abstract
There are two fields producing geothermal energy in Costa Rica, Miravalles and Pailas. Miravalles has 4 steam units installed: Unit 1 (55 MWe, 1994), Wellhead Unit (5 MWe, 1995), Unit 2 (55 MWe, 1998) and Unit 3 (29 MWe, 2000), and also a binary plant: Unit 5 (19 MWe, 2004). On the other hand, Pailas has a binary unit with a production of 35 MWe installed (2011). The Miravalles field has supplied the steam and brine needed to generate over twenty years of exploitation (1994-2014), while Pailas field has approximately three years of operation, with changes in the configuration of wells. The performance of the fields, changes in strategies, in terms of production-injection are Described in the Following sections
Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.