Conference Papers Database New search

Power Enhancement of Dieng Geothermal Installed Capacity

Efrata MELIALA, R.H. RIDWAN, Supriadinata MARZA

Key words
power enhancement, remaining life assessment, equipment & plant performance test, EPCC Tie In
Conference
World Geothermal Congress
Year
2015
Session
Production Engineering, Steam Gathering Systems
Language
English
Paper number
25017

Full text

827 KB, opens in a new tab

Abstract

Dieng geothermal field has proven reserve with very promising proposition, but in fact, since back in continuous operation on 2002, power generation tends to be not stable and has a relatively rapid decline. Several technical methods have been done that systematically use to increase the production capacity of this field. Begin with a general assessment to map the problem and find alternative solutions, then realize the technical constraints of the solution in terms of production wells productivity, steam production process, brine injection scheme and plant performance & reliability. The series of these methods has resulted in increased average power production of 10 MW to 52 MW by the end of the project on 2013.

Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 29 September 2026, 4:51 am.