Power Enhancement of Dieng Geothermal Installed Capacity
- Key words
- power enhancement, remaining life assessment, equipment & plant performance test, EPCC Tie In
- Conference
- World Geothermal Congress
- Year
- 2015
- Session
- Production Engineering, Steam Gathering Systems
- Language
- English
- Paper number
- 25017
Full text
827 KB, opens in a new tab
Abstract
Dieng geothermal field has proven reserve with very promising proposition, but in fact, since back in continuous operation on 2002, power generation tends to be not stable and has a relatively rapid decline. Several technical methods have been done that systematically use to increase the production capacity of this field. Begin with a general assessment to map the problem and find alternative solutions, then realize the technical constraints of the solution in terms of production wells productivity, steam production process, brine injection scheme and plant performance & reliability. The series of these methods has resulted in increased average power production of 10 MW to 52 MW by the end of the project on 2013.
Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.