Conference Papers Database New search

Te Mihi Steamfield Production Development Design

Kim HARWOOD, Kevin KOOREY, Chris MANN

Key words
steamfield, design, production engineering, innovation, Wairakei, Te Mihi
Conference
World Geothermal Congress
Year
2015
Session
Production Engineering, Steam Gathering Systems
Language
English
Paper number
25012

Full text

1826 KB, opens in a new tab

Abstract

The Wairakei Steamfield now supplies three power stations with the commissioning of Te Mihi Station in 2013. In 2008 to 2013 period the development was focused in the Te Mihi plant area to maximise energy generation from increased reservoir take. The Te Mihi zone of the steamfield has been in production since 1983, principally supplying the Wairakei Station. In 2006 the supply to Poihipi Station was added and finally in 2013, Te Mihi Station. Through this period the existing stations remained in service while the new steamfield plant was integrated into a brownfields site. Reinjection capacity was significantly increased and new zones were commissioned. Design challenges included the need to be compact to permit future production well drilling, topography, three different station inlet steam conditions, redundancy and buffer required in the reinjection system, flexibility to swing steam production amongst the stations, high steam quality, dynamic stability and maintaining production to existing stations during construction.

Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 29 September 2026, 1:48 am.