Conference Papers Database New search

Improving the Annual Net Power Output of Geothermal Binary Power Plants

Stephanie FRICK, Stefan KRANZ, Ali SAADAT, Ernst HUENGES

Key words
net power, binary power plants, plant design, operation, optimization, wet cooling towers, air-cooled condenser
Conference
World Geothermal Congress
Year
2015
Session
Power Generation
Language
English
Paper number
26065

Full text

536 KB, opens in a new tab

Abstract

Geothermal binary power plants that use hot fluid with temperatures between 100 and 200 °C can be applied for both, the extended use of high-enthalpy geothermal resources as well as the exploitation of low-enthalpy geothermal systems even far away from volcanically active areas. Even though geothermal low temperature power plants offer a huge potential and have been installed at more than 100 sites, techno-economic challenges still prevent a broader use. Current research activities in the field of low temperature power plant technology mainly aim for an enhanced performance of the power plant cycle at the design point by means of improving conversion cycle set-up (e.g. trans-critical cycles or multi-pressure cycles), selecting more suitable working fluids (e.g. new pure fluids or working fluid mixtures) or developing plant components with higher performance (e.g. turbines or heat exchanging equipment). Experience from running power plants, however, shows that improving the design point performance is not the only issue since plant operation can deviate significantly from the design conditions, esp. due to variable ambient conditions. In comparison to site- and plant-specific investigations, which have been carried out for existing power plants, this contribution will discuss general aspects of improving operational plant performance and hence the annual net power output. The cooling system thereby plays the central role since geothermal binary plants typically need to remove relatively large amounts of waste heat by means of power consuming cooling equipment (e.g. forced-draught wet cooling towers or air-cooled condensers). Referring to the annual net power output, improvement potential especially exists for the design of the interface between power plant cycle and cooling system, for the component specification within the power plant cycle (e.g. recuperator, condenser and turbine) and for the cooling system operation strategy.

Copyright 2015, International Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2029 World Geothermal Congress. Congress details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 29 September 2026, 11:11 pm.