An Economic Comparison Between Conventional and Modular Geothermal Development Models
- Conference
- New Zealand Geothermal Workshop
- Year
- 1993
- Language
- English
Full text
772KB, opens in a new tab
Abstract
The concern of the energy for t o the steaa p r i c e , stean pr ice should enable the geothernal producer t o recover the pre-production investaent, operating expenses, taxes and al so t o achieve an a t t r a c t i v e r a t e of return, The steaa p r i c e should also enable the user t o the generating cost of the geotheraal power plant, This paper describes the conparison study of the econonics o f two hypothetical geothernal nodels: conventional and nodular, The conventional is designed t o deliver geothernal s t e a r i n t o two centrally located power plants, while the modular i s designed t o deliver the steaa i n t o six portable power plants located separate 1 . The nodular requires a higher pre-production investnent, b u t due t o a shorter pre-production period, the is nore a t t r a c t i v e econoaically,
Copyright 1993, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.