Conference Papers Database New search

Additional Wellhead Units at Ulumbu, Indonesia

Mendive, David ., Heninger, Milan ., Geffert, Sean . and Hamacek, Yvette

Key words
Geothermal power, wellhead, power plant, small scale, dry steam, expansion, non-condensing, Ulumbu, Flores Island, Indonesia, GDA, Geothermal Development Associates, PT PLN (Persero), PT Perusahaan Listrik Negara (Persero), Rekadaya Elektrika
Location
Ulumbu, Indonesia
Conference
New Zealand Geothermal Workshop
Year
2014
Session
Geothermal Engineering - Production and Management
Language
English
Paper number
116

Full text

635 KB, opens in a new tab

Abstract

Geothermal Development Associates (GDA) provided engineering, major equipment, and startup and commissioning services to PT Perusahaan Listrik Negara (Persero) (PLN) for a modular 2 x 2.5 MW geothermal wellhead plant located at Ulumbu, Flores Island, Indonesia. PT Rekadaya Elektrika (Rekadaya) constructed the plant under a separate contract with PLN. The plant was commissioned in August 2014. GDA also provided construction support and training for PLN personnel. The new units, supplied by GDA, are the 3rd and 4th units installed at Ulumbu, which are all served by the same dry steam production well, ULB-2, drilled in 1994.

Copyright 2014, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 25 September 2026, 9:36 am.