Conference Papers Database New search

Utilization of Jaboi Geothermal Resources by Using Binary Cycle Power Plant

Suardi Nur

Location
Jaboi, Indonesia
Conference
Indonesian Geothermal Association Conference
Year
2013
Language
English

Full text

157 KB, opens in a new tab

Abstract

The conceptual model of binary cycle power plant for Jaboi geothermal field is proposed. The evaporator pressure and geothermal fluid flow rate is optimized. The geothermal fluid inlet temperature is estimated 200°C and injection temperature is calculated 80.68°C. The analysis shows to produce 3 MW net power output electricity, it is required 95 kg/s geothermal flow rate. The evaporation pressure of secondary working fluid is optimized at 1700 kPa, which yield the maximum net power output production.

Copyright 2013, Indonesian Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.173 (216.73.217.173).
Viewed 22 September 2026, 10:21 pm.