Injection Test Evaluation for New Injector Candidates in Darajat Field as Part of Darajat Injection Management
- Location
- Darajat, Indonesia
- Conference
- Indonesian Geothermal Association Conference
- Year
- 2013
- Language
- English
Full text
649 KB, opens in a new tab
Abstract
Injecting condensate back into the reservoir plays an important role in maintaining sustainability of the geothermal resource. The injection process provides pressure support and recharge to the reservoir. However, injecting condensate back into the reservoir requires optimization of the amount of condensate injected to minimize interference between the injection and production wells. Excessive injection would cause reservoir cooling that results to condensation of the steam reservoir. Strong interference between the injection and production well would also cause rapid condensate breakthrough that may reduce steam production or even kill the production well. This paper describes the evaluation of back-up injector candidates DRJ-05A, DRJ-12 and DRJ-24 by conducting injection tests in 2011. Although (less than a month each), nevertheless these injection tests have provided important data regarding injection impact using a multi-disciplinary set of data. For future injection tests, it is highly recommended that the tests be performed for a minimum of three (3) months. This test duration is currently perceived to be sufficient to observe the movement and impact of the condensate to surrounding wells.
Copyright 2013, Indonesian Geothermal Association. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.