Comparison of Multiple Load Aggregation Models for annual hourly simulations of ground heat exchangers
- Key words
- BHE design, g-functions, hourly simulations, aggregation methods
- Conference
- European Geothermal Conference
- Year
- 2013
- Session
- 9 Shallow (SG)
- Language
- English
- Paper number
- SG1-17
Full text
943 KB, opens in a new tab
Abstract
In most geothermal heat pumps installations, the vertical ground heat exchangers (BHE) represent the most important cost item and a careful analysis is needed to assure a long time performance together with the economical sustainability of the project. The most efficient way to predict the temperature evolution in time and space of a ground volume in contact with a system of BHE, is the recursive calculation of basic temperature response factors. Furthermore hourly load simulations along multiyear periods are considered the most reliable approach for simulating the thermal interaction between the ground and a system of BHEs. In this paper the Multiple Load Aggregation Algorithm is considered. In particular a detailed comparison with 5 year non aggregated data and an optimization analysis are performed in order to test and possibly enhance the original procedure. The proposal of enhancement is based on the introduction of an additional term, able to improve the accuracy of the aggregation method especially in case of non continuous building (and ground) heat load profiles, when the heat pump system is not operating for weeks or months.
Copyright 2013, European Geothermal Conference. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.