Te Mihi Geothermal Power Project - from Inception to Execution
- Key words
- Te Mihi, cooling tower, reinjection, noise level, steam quality, acid dosing, IEC 61850
- Location
- Te Mihi, New Zealand
- Conference
- New Zealand Geothermal Workshop
- Year
- 2012
- Session
- 06. Geothermal Engineering - Production and Management
- Language
- English
Full text
240KB, opens in a new tab
Abstract
The inception of the 166 MW Te Mihi geothermal power project followed the successful re-consenting of Wairakei power station in 2007. The configuration and construction of the Te Mihi power station in the west of the field optimised the use of the geothermal resource and helps to address some of the additional resource consent conditions relating to the continued operation of the Wairakei power station. Although the existing steamfield and any extension would be able to supply steam for electricity generation for many more years, any additional re-consenting of the Wairakei station in its existing location and current, or even altered, configuration was considered to be difficult beyond its current consent expiry in 2026. The Te Mihi geothermal power station is a staged replacement of the existing Wairakei A and B power station. The Te Mihi power station is currently one of the single biggest geothermal developments in the world. This paper discusses some of the challenges relating to development, consenting, design and construction of this significant project.
Copyright 2012, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.