New Focus on Wellhead Power Generation

David L. Mendive, and Lawrence H. Green

Key words
wellhead power generation, small-scale geothermal plant, Eburru, Kenya
Location
Eburru, Kenya
Conference
New Zealand Geothermal Workshop
Year
2012
Session
06. Geothermal Engineering - Production and Management
Language
English

Full text

238KB, opens in a new tab

Abstract

Geothermal wellhead power generation units are increasing in popularity due to speed and simplicity of installation, portability, and low-operating cost. They can utilize exploration wells, or wells deemed to be sub-commercial but still able to support a small-scale application. A significant benefit to using wellhead units is early generation of power during wellfield development of large projects. The power can be delivered into the local grid, or it can be used in support of drilling activities. Installing wellhead units early in the development phase can also help quantify the response of the reservoir to production, which can assist in calibrating reservoir models. Wellhead units are now either planned or being installed at various sites in Kenya. Geothermal Development Associates (GDA) recently supplied and successfully commissioned the first wellhead unit at Kenya’s Eburru geothermal field.

Copyright 2012, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.216.199 (216.73.216.199).
Viewed 22 September 2026, 5:42 am.