Conference Papers Database New search

West Java Geothermal Update

Achmad FADILLAH, Tubagus NUGRAHA and Jemmi GUMILAR

Key words
West Java, Geothermal Development
Location
West Java, Indonesia; Java
Conference
Stanford Geothermal Workshop
Year
2013
Session
General
Language
English
Paper number
Fadillah

Full text

316 KB, opens in a new tab

Abstract

Almost 30 years since Kamojang, the first geothermal power plant in Indonesia located in West Java, had produced 30 MWe electricity that makes West Java become “the oldest brother” for geothermal development in Indonesia. Now after 30 years, West Java geothermal development had been advanced with total Energy Sales Contract reach 2.295 MWe in 8 location and have been produce 47% or approximately 1.075 MW from Kamojang (200 MW), Darajat (271 MW), Salak (377 MW) and Wayang Windu (227 MW). The rest 1.222 MW were still develop like Kamojang V, Darajat III, Wayang Windu II, Patuha, and Karaha Bodas. Another location like Mt. Tampomas, Mt. Tangkuban Parahu and Cisolok Cisukarame was still in exploration phase. Beside that, there was Mt. Ciremai that in geothermal working area bidding process. Last but not least, there were 7 location priority in phase geological survey to prelimenary. This paper give us image of geothermal growth in West Java since his early exploration until now. Beside that, it will explain the regulation that support geothermal development and investment opportunity.

Copyright 2013, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.216.199 (216.73.216.199).
Viewed 22 September 2026, 4:39 am.