Turbine Upgrade for Geysers Geothermal Power Plant
- Key words
- Turbine; upgrade; The Geysers; geothermal power plant
- Location
- The Geysers, California
- Conference
- Geothermal Resources Council Transactions
- Year
- 2011
- Session
- Turbines
- Language
- English
Abstract
After utilization of The Geysers geothermal reservoir for electric power generation since 1960, the reservoir pressure and the steam flow had declined and performance of the turbine was also degraded. This situation is common not only at The Geysers but also other geothermal power plants. Toshiba performed the turbine upgrade, which included the steam path redesign optimized to the reduced steam inlet deliverability and applied new technology for performance improvement and erosion/corrosion countermeasures, for the geothermal turbines at The Geysers operated and maintained by CALPINE. It’s been successful for improving performance and allowing operation over 8 years without a turbine opening. This paper shows turbine upgrade technology, the outage result after this 8 year run and the performance trend during the run.
Copyright 2011, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.