Application of a Steam Purity Monitoring System at the Triple Flash Nga Awa Purua Geothermal Power Station in New Zealand

Taguchi, Kosuke; Makimoto, Shizuka; Ishii, Daisuke

Key words
Nga Awa Purua; Power generation; Triple flash; Steam separator; Steam scrubbing; Steam washing; Steam purity; Silica; Cholride; pH; Non condensable gas; Scaling; Monitoring; New Zealand
Location
Kawerau, New Zealand; Taupo Volcanic Zone
Conference
Geothermal Resources Council Transactions
Year
2010
Session
Power plant design and operation; Steam scrubbers; Brine che
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The world’s largest single-cylinder geothermal turbine has recently been deployed at the Nga Awa Purua Geothermal Power Station. The rated 140MW NAP plant employs a triple flash steam separation and steam purification system. The plant utilizes conventional mechanical separation and scrubbing water injection processes but during its design, construction and commissioning, an additional automated steam purity monitoring technology was developed. This paper describes the steam purity monitoring system and its effectiveness as applied to this project.

Copyright 2010, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 29 September 2026, 4:19 am.