Conference Papers Database New search

Control System Concepts to Improve Geothermal Plant Availability

Rodriguez, Saul; Speirs, Donald

Key words
Control Systems; Geothermal; 2003; 1002; PFD; MTBF; Availability; Power plant; Geocost; ALSPA; Reliability
Conference
Geothermal Resources Council Transactions
Year
2010
Session
Power plant design and operation; Operations management
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Advanced power plant controls are now commonly applied to the newest fossil, nuclear and hydro plants to achieve maximum performance and increase reliability. The expansion of integrated plant controls to geothermal plants presents equally valuable opportunities to improve energy production from this important resource. In the past, one out of two (1oo2) systems have been used due to their lower installation costs but it is not clear whether during the life cycle of the plant this actually represents a saving, due to the higher risk of false alarms and increased plant shutdown when compared with the more advanced two out of three (2oo3) architecture. This paper will discuss the key elements of plant control system architecture for geothermal, highlighting the benefits that a 2oo3 integrated architecture can provide in relation to plant availability.

Copyright 2010, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 3 October 2026, 4:24 pm.