Geothermal Heating and Cooling System Construction Process

Geyer, John D.

Key words
Geothermal heat pump; Ground loop; Ground-coupled heat exhanger; HVAC; Heating and cooling
Conference
Geothermal Resources Council Transactions
Year
2010
Session
Geothermal heat pumps; Geothermal overviews
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Geothermal heating and cooling systems integrate a groundcoupled heat exchanger, heat pumps and ancillary equipment, indoor distribution systems (either forced air or radiant piping) and controls into a single operating facility. Equipment sizing, operating efficiencies and run-fractions of components are matched for compatibility; over-sizing of any item impairs system efficiency. Installation of elements occurs at different stages of building construction, so a Design-Build geothermal contractor makes repeated entries onto a project. Quality control and assurance at each stage of installation are essential. Project Management is more complex than standard mechanical subcontracting and job costs reflect multiple mobilizations and payment rates for different trades. The latter include excavation, plumbing, electrical, refrigeration, and mechanical work. Geothermal design and construction are “custom work” rather than mass production so skilled labor may be limited and competitive bidding or procurement practices may be ineffective: “Low Bid and No Experience” is not acceptable for geothermal work.

Copyright 2010, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.31 (216.73.216.31).
Viewed 11 October 2026, 11:45 am.