Design and Construction of Wayang Windu Unit 2 Geothermal Power Station

Yamaguchi, Naoko

Key words
Wayang Windu; Indonesia; West Java; Single Flash; Plant Performance; Integrated Control System; Intake Screen Cleaning
Location
Wayang Windu, Indonesia; Java
Conference
Geothermal Resources Council Transactions
Year
2009
Session
Power plant design and operation
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Wayang Windu geothermal power station, owned and operated by Star Energy Geothermal (Wayang Windu) Limited, has been operating its first unit (Unit 1) from 1999. Although construction of the second unit (Unit 2) was also scheduled at the same time as Unit 1, it was suspended due to the economy crisis. At that moment, the civil and architectural works including all equipment foundations were completed. After a decade, the Unit 2 construction was resumed. It was not just a recommencement of the suspended works; it also involved some design improvements on the performance and operability under the restrictions of the existing constructs and materials. This paper introduces representative items of those improvements. The construction of Unit 2 was completed ahead of the original schedule and the commercial operation started from February 2009 with producing more than the target gross output of 117MW.

Copyright 2009, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.227 (216.73.216.227).