Conference Papers Database New search

Pico Vermelho Geothermal Project, Azores, Portugal

Kaplan, Uri; Nathan, Avi; da Ponte, Carlos Alberto Bicudo

Key words
Power Plant; Azores Islands, geothermal power plant, ORC, binary plant
Location
Pico Vermelho, Azores; Sao Miguel, Azores
Conference
Geothermal Resources Council Transactions
Year
2007
Session
Power plant design and operation
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The fourth stage of geothermal power generation on the island of São Miguel was completed at the end of 2006 when the 10 MW (net) Pico Vermelho plant started continuous electricity delivery to the island’s grid. It is estimated that geothermal contribution will reach 42% of the production of S. Miguel Island in 2007. The two-phase binary type power plant represents the results of the fruitful cooperation between the Azores geothermic company: SOGEO, GeothermEx and Ormat to provide the optimal plant for the Sao Miguel geothermal resource.

Copyright 2007, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).