40 years of generation at Wairakei. Power generation commenced on 15 November 1958when Assistant SuperintendentC D loaded the 6.5 high pressure turbine generator, G2, to 1.7 Forty years of a match and a very successful between the Wairakei geothermal field and the Wairakei geothermal power station have ensued.

In, ëWairakei - The First Twenty Yearsí, Ian wrote ìWairakei, it is hoped, will be like grandfatherís axe - four new shafts, two new heads, but still the same axeî. There have been new shafts and new heads but Wairakei is Wairakei, is is Wairakei, is Wairakei . . . .. . There is no hoping after forty years, it is reality. This is a remarkable achievement fkom a plant that is now a consistent and reliable electricity generation facility. But it wasnít like this.

Copyright 1999, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

You have opened 0 records today from 216.73.217.141 (216.73.217.141).
Viewed 21 September 2026, 11:00 pm.