The Manito Geothermal Livelihood Project: Stimulating Economic Development in Rural Areas
- Location
- Manito, Philippines; Luzon
- Conference
- New Zealand Geothermal Workshop
- Year
- 1999
- Session
- Environmental Aspects
- Language
- English
Full text
338KB, opens in a new tab
Abstract
A drying plant and a 1.5 MW power plant was constructed in Manito, Albay, Philippines. The project was made possible through a government inter-agency joint undertaking. This project is the energy sectorĂs contribution to the governmentĂs thrust to improve and accelerate the delivery of basic services, particularly to marginalized communities.
Copyright 1999, University of Auckland. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.