Generation Overview of Olkaria Power Plant for the Last 20 Years
- Key words
- Power Plant Operations; Base Load; Availability Factor; Utilization Factor; O&M Costs; Overall Load Factor; Cost Per Unit; MMS; Brine; Re-Injection; Impulse-Reaction; Direct Contact; Saturation Pressure; Field Simulation; Preventive/Condition Based Mainte
- Conference
- Geothermal Resources Council Transactions
- Year
- 2002
- Session
- Power plant design and operation; Economics; Injection
- Language
- English
Copyright 2002, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.