Title:

Cost of Geothermal Power and Factors That Affect It

Authors:

Subir K. Sanyal

Key Words:

Geothermal Power, Power Cost, Factors

Conference:

Stanford Geothermal Workshop

Year:

2004

Session:

KEYNOTE SPEAKER

Language:

English

File Size:

151KB

View File:

Abstract:

This paper presents an analysis of the sensitivity
of the cost of geothermal power to: (a) capital
cost; (b) operations-and-maintenance (O&M)
cost; (c) make-up well drilling cost; (d) resource
characteristics (well productivity and its rate of
decline); (e) development and operational
options (installed plant capacity, number of years
of make-up well drilling, and project life); and
(f) macro-economic climate (interest and
inflation rates). The power cost here represents
levelized cost (in cents per kilowatt-hour) over
the project life, the capital cost being amortized
over 30 years; any royalties, tax burden, or tax
credit are ignored. A range of development
sizes, from 5 to 150 MW, is considered. The
economy of scale in both capital cost and O&M
cost, as well as the higher productivity decline
rate due to increased installed capacity, are taken
into account.


ec2-3-21-233-41.us-east-2.compute.amazonaws.com, you have accessed 0 records today.

Press the Back button in your browser, or search again.

Copyright 2004, Stanford Geothermal Program: Readers who download papers from this site should honor the copyright of the original authors and may not copy or distribute the work further without the permission of the original publisher.


Attend the nwxt Stanford Geothermal Workshop, click here for details.

Accessed by: ec2-3-21-233-41.us-east-2.compute.amazonaws.com (3.21.233.41)
Accessed: Friday 26th of April 2024 04:08:53 PM