Injection Management at the Miravalles Geothermal Field

Paul Moya, Antonio Yock

Location
Miravalles, Costa Rica
Conference
Stanford Geothermal Workshop
Year
2004
Session
RESERVOIR
Language
English

Full text

247KB, opens in a new tab

Abstract

Electricity began to be produced at the Miravalles
geothermal field in early 1994. Since then, the
installed capacity has increased from 55 MWe to
142.5 MWe. A binary plant (15.5 MWe) will be
finishing its final tests by February 2004, increasing
the fieldís capacity to 158 MWe. The management
of injection in the field during nearly ten years of
exploitation is described in the following sections.
The most recent numerical simulation of the
Miravalles reservoir suggested changing the
distribution of injection (more to the west and less to
the south), in order to improve the performance of the
reservoir. These changes were implemented, and
their results are presented.

Copyright 2004, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.216.195 (216.73.216.195).
Viewed 23 September 2026, 7:27 pm.