Conference Papers Database New search

Pressure Response to Production and Injection at the Miravalles Geothermal Field

Paul Moya, Sergio Castro

Key words
pressure response, injection, Miravalles Field
Location
Miravalles, Costa Rica
Conference
Stanford Geothermal Workshop
Year
2004
Session
FIELD STUDIES
Language
English

Full text

286KB, opens in a new tab

Abstract

The Miravalles Geothermal Field has been producing
electric energy since March 1994. It has provided
steam for Unit 1 (55 MWe, installed 1994), a
wellhead unit (5 MWe, 1995), Unit 2 (55 MWe,
1998) and Unit 3 (27.5 MWe, 2000). Unit 5, a 15.5
MWe ìbottoming cycleî unit, is expected to
complete its final tests by February 2004, at which
point the total installed capacity in Miravalles will be
158 MWe. The behavior of reservoir pressure during
the period of exploitation is described in the
following sections. Over the first ten years of
exploitation, the field has successfully supplied the
steam needed to generate at the installed capacity.

Copyright 2004, Stanford Geothermal Program. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the next Stanford Geothermal Workshop. Workshop details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 28 September 2026, 8:35 am.