Based upon the present condition of geothermal resources and drilling technology in Japan, the break even cost of producing electricity is 12.7/KWh at the bus bar. This cost is estimated for a 15 year operation of 5 injection wells and 11 production wells, HDR system producing 240 MW. The study was based on an HDR system covering a subterranean land area of 1,200 m by 1,800 m at a depth of 4,000 m, having an average temperature of 300 degrees C. A double flash system was assumed for the power station. 16 sites suitable for the HDR system have been located in Japan through an analysis of data made available by MITI.

Copyright 1991, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.