Design and Construction of the Coso Geothermal Power Projects

Schoonmaker, James L.; Maricle, Mark F.

Key words
Power Generation; Production; USA; California; Inyo; Coso; Two Phase; NCG; Dual Flash; Turbines; Cooling Water; Cooling Tower; Distributed Control System; Injection; Gathering Systems; Gas Injection; Silica; Scaling; Single Flash; Transmission; CEC; Missi
Location
Coso, California
Conference
Geothermal Resources Council Transactions
Year
1990
Session
Power plant design and operation; Power grids
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The California Energy Company, Inc. (CECI) and Mission Power Engineering Company (MPE) have completed engineering and construction, and began operation of four additional geothermal generating units as part of the Coso Geothermal Project. These units are located on two sites in the COSO KGRA on the China Lake Naval Weapons Center in central California. IN 1988 four similar units were completed and place in service. Nine generating units are now operating, with a gross capacity of approximately 264 MWe. This paper describes the design, construction and start up of the latest four units.

Copyright 1990, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 3 October 2026, 5:46 pm.