Economics of Automatic On Line Tube Cleaning Systems

Rosser, Jim

Key words
Power Generation; Economics; USA; California; Inyo; Coso; Condensers; Surface Condensers; Tube and Shell; Cooling Water; NCG; Scale; Corrosion; Efficiency; O & M; CEC; China Lake; Coso Hot Springs; Condenser Cleaning System; Fouling; Algae; Ball Cleaning
Location
Coso, California
Conference
Geothermal Resources Council Transactions
Year
1990
Session
Economics; Power plant design and operation; Condensers; Fou
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

California Energy Company, Inc., CECI, operates nine 30 megawatt geothermal power plants located at Coso Hot Springs in Inyo County, California on the China Lake Naval Weapons Center property. The Navy I Unit 1 plant was commissioned on July 15, 1987. After on year of operation, an online surface condenser cleaning system was installed to ensure that maximum power output would continue. This paper presents the reasoning and economics of this system and the decision to install similar systems on the remaining plants.

Copyright 1990, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 4 October 2026, 6:44 am.