Cerro Prieto II (220 MW) and III (220 MW) Geothermoelectric Plants

Mercado, S.; Bermejo, F.; Heard, C.; Fernandez, H.; Angulo, R.

Key words
Power Generation; Well Completion; Production; Utilities; Mexico; Cerro Prieto; Well Casing; Casing; Wellheads; CFE; Chemical Composition; Turbines; Condensers; NCG; Thermodynamics; Dual Flash; Efficiency; Exergy; Plant Factors
Location
Cerro Prieto, Mexico
Conference
Geothermal Resources Council Transactions
Year
1990
Session
Power plant design and operation; Flash steam power generati
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Geothermal plants Cerro Prieto II and III of 220 MW each achieved excellent operation conditions during 1987 with plant factors of 0.75 and 0.86, respectively. This demonstrates the operation of large geothermal plants with plant factors higher than have been achieved in Mexican thermoelectric plants. With the total installed capacity in the Cerro Prieto field of 620 MW, 4 TW h of electrical power have been generated in 1987 which represents a saving of 7.55 million barrels of oil.

Copyright 1990, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 1 October 2026, 3:25 pm.