Review of the Status of Geothermal Development and Operation in Indonesia 1985 to 1990

Radja, Vincent T.

Key words
Country Update; Exploration; Reservoir Engineering; Indonesia
Location
Indonesia
Conference
Geothermal Resources Council Transactions
Year
1990
Session
Geothermal overviews; Exploration; Energy policy; Reservoir
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The electric power sector in Indonesia will be expanded with an additional generating capacity of about 1,225 MW at the end of the fifth year development plant (1989/1990 to 1993/1994) from the existing 8,529 MW. At present a 140 MW geothermal condensing plant (one unit of 30 MW and 2 units of 55 MW, all in Kamojang) and two noncondensing monobloks (2 MW in Dieng and 25 kW in Kamojang) have been operating successfully since 1979. Based on the fifth year development plan the government of Indonesia has decided to install an additional 235 MW on the island of Java and 15 MW on North Sulawesi, for a total installed capacity of 377.25 MW.

Copyright 1990, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 4 October 2026, 3:28 pm.