Conference Papers Database New search

The Coso Geothermal Power Projects

Schoonmaker, James L.

Key words
Power Generation; USA; California; Mono; Coso; Scheduling; Case Histories; Non Condensable Gases; Power Plant Design; Controls; Enthalpy; Capacity Factor; Fast Track
Location
Coso, California
Conference
Geothermal Resources Council Transactions
Year
1989
Session
Power plant design and operation; NCG; Operations management
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The California Energy Company, Inc. (CECI) and Mission Power Engineering Co. (MPE) formed a team in 1987 to develop Units 2 through 9 of the COSO Project. Each of these units are 30 MW nominal, dual flash design. They are located on four sites in the COSO KGRA in Central California. This paper describes the Project and progress to date on thee 8 units. The wells at specific sites have developed with enthalpies ranging from 420 to 1000 Btu/Lb. The same basic hardware, including the turbine generator sets, have been used for this full range of conditions in order to allow the very rapid development of this resource area. The generating plants of this paper were started in March 1988. As of May 1989, four units are in commercial operation and the remaining four are in construction.

Copyright 1989, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.104 (216.73.216.104).
Viewed 3 October 2026, 9:00 am.