Conference Papers Database New search

Modular Design and Construction at the Bear Canyon 20 MW Power Plant

Phair, Kenneth A.

Key words
Power Generation; USA; California; Lake; The Geysers; Power Plant Design; Components; Economics; Modules; Critical Path; Scheduling
Location
The Geysers, California
Conference
Geothermal Resources Council Transactions
Year
1989
Session
Power plant design and operation; Operations management
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

The Bear Canyon 20 MW Power Plant was designed around numerous modular equipment packages. This modular concept resulted in significant schedule savings in design, construction, and startup. The use of modular equipment contributed to the completion of the project more than 4 months ahead of schedule.

Copyright 1989, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.