Cerro Prieto I First Units Running from 1973 to 1987 without Corrosion Problems in the Turbines

Mercado, S.

Key words
Power Generation; Turbines; Corrosion; Coupons; Condensate
Location
Cerro Prieto, Mexico
Conference
Geothermal Resources Council Transactions
Year
1987
Session
Corrosion; Turbines; Scaling
Language
English

Full text

Open the paper

Opens in a new tab

Abstract

Cerro Prieto gained during the first year of operation of the Cerro Prieto I central power station units 1 & 2 of 37.5 MW each, was a significant help on the development of the field. The continuous operation of these plants was an example that shows that geothermal energy can be economically used. Until now the turbines of units 1 &2 have fourteen years running with corrosion problems. In fact several units were constructed by Commission Federal de Electricdad to increase plants output to 620 MW which is actually the installed capacity in the Cerro Prieto geothermal field.

Copyright 1987, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.

Attend the 2026 Geothermal Rising Conference. Meeting details
You have opened 0 records today from 216.73.216.139 (216.73.216.139).
Viewed 1 October 2026, 2:14 pm.