A Method for Predicting Reservoir Performance of a Lumped-Parameter Model
- Key words
- Reservoir Engineering; Models; Reservoir Simulation; Enthalpy; Water In Flux
- Conference
- Geothermal Resources Council Transactions
- Year
- 1986
- Session
- Reservoir modeling
- Language
- English
Abstract
A prediction method of the reservoir performance for a lumped-parameter reservoir model with unsteady water influx from an infinite aquifer is presented. In this method, it is assumed that a short time fluid production and a short time water influx are alternately carried out.
Copyright 1986, Geothermal Resources Council. Readers who download papers from this site should honour the copyright of the original authors, and may not copy or distribute the work further without the permission of the original publisher.